A four-hour abridged executive version of the LE 101 that combines classroom instruction with intensive
hands-on experience in the simulated Clock Factory. The training exposes the frailty of Traditional Manufacturing Concepts in a high volume, low variety mass production facility. Students learn the process of assembling a variety of working clocks in an environment that begins with traditional thinking
(Push Scheduling) and is gradually transformed (3 rounds) into a world-class Lean facility utilizing Lean Concepts (Cell and Pull). Students learn directly the immediate and dramatic impact of the transformation process on themselves, their workplace roles, and the enterprise of which they are part. This is onsite for senior management.